Case study · Fort Worth, TX · 2018
Spalled slab repair on a self-storage third floor
The new slab started spalling within the first week after the pour. We took it down past the bad surface, rebuilt a smooth floor, and came back to seal it.
40,000 SF
Third floor
2018
Completed
4 steps
Bush hammer, grout, grind, seal

The problem
A new slab failing in its first week
Within a week of placement, the third-floor slab of a self-storage facility in Fort Worth began spalling across the surface. The weak top layer had to come off before any finish could go down.
What we did
We bush hammered the entire 40,000 square foot floor down past the bad surface, epoxy grouted the whole floor to fill the open, pitted concrete, then ground the grout back to a smooth, sound surface. Once the building was ready, we returned and sealed the floor.
Start to finish
How the floor came back